|    VR MACHINING    |    OUR ACTIVITIES    |    OUR KNOW-HOW    |    YOUR REQUESTS    |    CONTACT US    |


 
Français  
Nederlands  
English » 

SEND US YOUR REQUESTS AND QUESTIONS
 
Automatic transmission form

vca

You're here  >>> OUR KNOW-HOW 


Discover in pictures an outline of our know-how
!

Our gallery of images and videos will enable you to discover with the liking of the examples which are described there a very broad outline of our know-how and our competences...

   
  # BORING Barrage (water Turbine) [ See the pictures ]
      Barrage (Valve of regulation) [ See the pictures ]
      Petrochemical factory [ See the pictures ]
      Shipyard [ See the pictures ]
  # CYLINDRICAL SURFACING BY MILLING Hydro-electric power station [ See the pictures ]
  # CORRECTION OF SUPPORT Petrochemical factory [ See the pictures ]
  # REHABILITATION OF CHAMFERS WITH TULIPS Thermo plant [ See the pictures ]
  # RESTORATION OF CAP OF EXCHANGER Petrochemical factory [ See the pictures ]
  # CORRECTION OF INSTALLATION OF SEAT Thermo plant [ See the pictures ]
  # CIRCULAR MILLING Iron and steel plant [ See the pictures ]
  # COUNT OF SHEAR Iron-foundry [ See the pictures ]
      Last projects [ See the pictures ]
Boring of a water turbine of barrage
 
  • Switzerland.
  • Boring of a water turbine of stopping.
  • Ø 4075 mm.
  • 6/100 of final tolerance.
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Click to increase ]  
                 
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Watch the video ]  
[ TOP ]
Boring of a valve of regulation
 
  • Dam Hun on the Meuse - Belgium.
  • Ø 320 ---> 322 H 8.
  • 4/10 of final tolerance.
     
[ Click to increase ]   [ Watch the video ]
[ TOP ]
Resumption of two Borings on a casing of reducer
 
  • Petrochemical factory - Belgium.
  • Ø 560 H 7.
  • Note how all machining was done in the machine !
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Click to increase ]  
                 
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Click to increase ]  
                 
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Click to increase ]  
                 
           
  [ Click to increase ]   [ Click to increase ]       [ Watch the video ]  
[ TOP ]
Begun again of a Boring for installation of a ring
 
  • Shipyard of Saint-Nazaire - France.
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Click to increase ]  
[ TOP ]
Cylindrical surfacing by milling
 
  • Hydro-electric power station - Lithuania.
  • ± Ø 6800 mm.
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Click to increase ]  
[ TOP ]
Correction of support
 
  • Petrochemical factory - Belgium.
             
  [ Click to increase ]   [ Click to increase ]          
[ TOP ]
Rehabilitation of chamfers with tulips
 
  • Thermo plant - Porcheville - France.
             
  [ Click to increase ]   [ Click to increase ]          
                 
           
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]      
[ TOP ]
Restoration of a cap of exchanger
 
  • Petrochemical factory - Hillock - France.
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Click to increase ]  
                 
           
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]      
[ TOP ]
Correction of installation of seat on a valve HP
 
  • Porcheville - France.
             
  [ Click to increase ]   [ Click to increase ]          
[ TOP ]
Circular milling (Base of a furnace)
 
  • Iron and steel plant - Charleroi - Belgium.
  • Ø 3200 mm.
         
  [ Click to increase ]   [ Click to increase ]   [ Click to increase ]   [ Click to increase ]  
                 
             
  [ Click to increase ]           [ Watch the video ]  
[ TOP ]
Count of shear
 
  • Iron-foundry - Herstal - Belgium.
           
[ Click to increase ]   [ Click to increase ]     [ Watch the video ]
[ TOP ]
Last projects
 
  • Machining turbine coupling
  • Precision bore 55H7.
    .
               
[ Click to increase ]   [ Click to increase ]     [ Watch the video ]
[ TOP ]
 
Created and designed by CoolBay - All rights reserved © CoolBay / JLMedda / 2008.10   -   Partners